Property Management & Restoration
TRUINSPECTOR FOR DAMAGE & RESTORATION

Document the damage. Follow the restoration.

Organize visible water, fire and storm damage by room, material and work stage, with supporting photos and practical follow-up reports.

Damage & Restoration illustrative setting
Illustrative sector image
YOUR DOCUMENTS. YOUR REQUIREMENTS.

Bring your checklist.
Check the visible work.

Upload customer directions, guidelines, standards or contract requirements as PDF or Excel files. TruInspector Ai uses the relevant requirements alongside your photos and recorded videos to support a focused assessment.

1. Attach your requirements

Choose your industry and assessment type on Evaluations. Upload up to three PDF or Excel (.xlsx or .xls) documents, up to 5 MB each. Available for every industry and sector.

2. Add the evidence

Identify the property and unit, room or common area. Add photos or recorded video, select the assessment type, and attach your requirements for any specific priorities.

3. Review a traceable report

Relevant findings identify the customer document and available page, section or worksheet reference, explain the visible concern, and list corrective actions and missing field checks. Download the report as PDF or Excel.

Upload your requirements on Evaluations

Customer requirements are identified separately from official regulations. Confirm the applicable edition and scope; an upload does not establish legal applicability or certify compliance. Attachments stay within your signed-in workspace and are not included in public picture links.

Document-reading limits

Excel review uses up to the first 1,000 rows per worksheet and may summarize the content; embedded pictures and charts are not read. Export important diagrams and longer requirements sections as PDF. Use clear, unlocked documents and check source references in the report. Unreadable content, missing measurements, concealed conditions and requirements outside the evidence remain unverified. This is an assisted visual review, not a complete contract audit.

INDUSTRY-SPECIFIC REPORT EXAMPLES

See the observation.
Know what to verify.

These examples match this industry or specialty workflow. Each includes a detailed preliminary observation, inspector checks, recommended work and a closeout record. Use the arrow to hide or show the details.

Torn weather barrier and lifted window flashing illustrative reference photoTorn weather barrier and lifted window flashingThe white weather-resistant wrap is torn beside the lower corner of the window, exposing brown sheathing. Black flashing at the corner appears wrinkled and lifted away from the surface.Read picture report
Torn weather barrier and lifted window flashingIllustrative item image · Preliminary example

Detailed observation

The visible tear and loose flashing interrupt the apparent continuity of the exterior water-control layers at a sensitive window corner. This creates a condition needing review before cladding covers it. The picture does not reveal the concealed sill pan, drainage path, substrate moisture, adhesion strength or whether the installation is still in progress; it does not prove an active leak.

What the inspector should look for

  • Confirm installation stage, approved window detail and compatibility of the wrap, tape, primer and sealants.
  • Inspect the full sill, jamb and head sequence, overlaps, adhesion and intended drainage openings.
  • Check substrate condition and any moisture through appropriate field methods before closing the assembly.

Recommendation and work plan

1. Mark the affected corner and review the approved window and weather-barrier detail before installing cladding. 2. Remove or rework damaged and loose material as directed by the product manufacturer and responsible building professional. 3. Prepare a clean, dry, suitable substrate and install compatible replacement wrap patches, flashing tape and specified primer or sealant in the correct drainage sequence. 4. Preserve required drainage openings; do not cover the defect with an arbitrary bead of sealant. 5. Verify adhesion, laps and continuity, perform any required field test, and obtain the required review before concealment.

Closeout documentation

Keep before-and-after images of sill, jamb and head transitions, product compatibility information, completed field checks and the reviewer’s release for concealment.

Applicable requirement: Apply the governing state/local adopted building or residential code, permit conditions and approved exterior-wall details together with the relevant product installation instructions. Verify required flashing and drainage details; no leak or compliance result is established from this image. An illustrative image does not establish a field measurement or compliance result.

Property / restoration — ceiling condition illustrative reference photoProperty / restoration — ceiling conditionA broad tan ceiling stain and peeling finish are visible above a window.Read picture report
Property / restoration — ceiling conditionIllustrative item image · Preliminary example

Detailed observation

The illustrative photo shows an irregular tan stain spreading across the ceiling near a window, with a small section of peeling finish at the ceiling edge. The discolored area has uneven boundaries. These visible finish changes warrant a source and material-condition check, but the image does not establish whether moisture is active, what caused the staining, or whether concealed components are affected.

What the inspector should look for

  • Record the property, unit, room, photo date and approximate affected limits using field measurements.
  • Check relevant exterior, plumbing or condensation sources through qualified assessment; record actual moisture readings, instrument, units and location if taken.
  • Compare the applicable customer checklist or contract criterion, and verify local requirements and hazard precautions before disturbing materials.

Recommendation and work plan

Protect the area as warranted by the site assessment and have the responsible team determine the source before cosmetic work. Select the repair scope from actual moisture and material-condition checks. Once the source and required drying or other corrective work are verified, prepare and restore the affected finish with compatible products appropriate to the substrate and project requirements. Do not simply conceal an unresolved stain or presume a chemical treatment is needed.

Closeout documentation

Keep the original view, actual field readings and source-repair record, then add a matching completion photo and qualified follow-up. A clean-looking finish alone does not verify concealed drying or clearance.

Applicable requirement: Check applicable local property requirements and any supplied maintenance or restoration criteria; the image does not establish a cause or measured moisture. An illustrative image does not establish a field measurement or compliance result.

All images and findings are illustrative. They show report structure and inspection topics, not actual field evidence or a compliance decision.

FIELD EVIDENCE & REPORTING

Keep the observation
in context.

Select the state, industry, asset or safety topic and work type. Review matched references and field checks alongside the photo or sampled video frame.

01

Record affected rooms and materials during initial condition review, work in progress or completion review.

02

Upload PDF or Excel scopes, restoration guidelines, standards or contract requirements to compare with photo and video evidence.

03

Add actual moisture readings and other field measurements in your notes; retain findings, corrective steps and completion evidence.

SCOPE & QUALIFIED REVIEW

Know what the
evidence can establish.

Staining does not prove active moisture, mold or a cause of loss. Images cannot verify drying targets, contamination clearance, concealed damage, structural integrity or insurance coverage. Qualified field checks and appropriate measurements remain necessary.

Source matches are preliminary. If a governing requirement is unavailable or outside the selected regulatory reference scope, the record remains unverified.

Discuss your requirements
INSPECTION REPORTING

Damage & Restoration reports

Turn photos and recorded video into a reviewable condition record. Keep visible findings, evidence, recommended actions and follow-up together.

PDF reports with photos

Share observations and supporting pictures in a report your team can review.

Photo-linked Excel workbooks

Keep category, condition, description and action notes organized. Include location and GPS when supported by the evidence.

Category reports and follow-up

Classify mixed photos, review separate asset reports and track work status in the Data Hub.

Review Damage & Restoration report examples