1. Attach your requirements
Choose your industry and assessment type on Evaluations. Upload up to three PDF or Excel (.xlsx or .xls) documents, up to 5 MB each. Available for every industry and sector.
Follow one clear workflow. Each short demonstration uses different imagery and examples selected for this industry.
Use supported landscaping, vegetation, fence, gate and roadway-lighting examples to organize observations for the right trade.
Illustrative image and finding; not a live assessment or compliance result.
Upload customer directions, guidelines, standards or contract requirements as PDF or Excel files. TruInspector Ai uses the relevant requirements alongside your photos and recorded videos to support a focused assessment.
Choose your industry and assessment type on Evaluations. Upload up to three PDF or Excel (.xlsx or .xls) documents, up to 5 MB each. Available for every industry and sector.
Identify the site, location and relevant area. Add photos or recorded video, select the assessment type, and attach your requirements for any specific priorities.
Relevant findings identify the customer document and available page, section or worksheet reference, explain the visible concern, and list corrective actions and missing field checks. Download the report as PDF or Excel.
Customer requirements are identified separately from official regulations. Confirm the applicable edition and scope; an upload does not establish legal applicability or certify compliance. Attachments stay within your signed-in workspace and are not included in public picture links.
Excel review uses up to the first 1,000 rows per worksheet and may summarize the content; embedded pictures and charts are not read. Export important diagrams and longer requirements sections as PDF. Use clear, unlocked documents and check source references in the report. Unreadable content, missing measurements, concealed conditions and requirements outside the evidence remain unverified. This is an assisted visual review, not a complete contract audit.
These examples match this industry or specialty workflow. Each includes a detailed preliminary observation, inspector checks, recommended work and a closeout record. Use the arrow to hide or show the details.

Fence / gatesBent or damaged fence posts and gaps between gates.Read picture report The example depicts bent fence posts and a possible gap at a gate. The view identifies an apparent opening but cannot establish its measured width, whether the gate latches or the full extent of damaged fabric and posts.
Secure an opening that presents a verified access concern while the repair is planned. Replace or straighten damaged components as appropriate, restore tension and attachment of fabric, and adjust the gate so it closes and latches under normal operation. Use the approved fence and gate details for materials and dimensions.
Test the gate, document the repaired posts and continuous fence line, and record measured clearances and materials.
Applicable requirement: Fence; also checks torn fabric and missing posts. An illustrative image does not establish a field measurement or compliance result.
The illustrative planting image supports a tentative count and plant-type estimate, not a botanical or health diagnosis. Some plants may be partly hidden and camera perspective can distort size and condition.
Create a location-based inventory with identification confidence. Separate routine trimming or irrigation adjustments from replacements that require approval. Have a qualified landscape reviewer confirm the cause of observed decline before specifying treatment, then set quantities and work limits for the maintenance crew.
Update the inventory after work, photograph each treated bed and record replacements, irrigation changes and follow-up dates.
Applicable requirement: Landscaping / Turf; species confidence needs review. An illustrative image does not establish a field measurement or compliance result.
Tree trimming / vegetationTrees or limbs obscuring signs or encroaching on the roadway.Read picture report A tree limb appears to extend toward a sign or roadside asset in the illustration. The image cannot establish measured clearance, tree condition, right-of-way limits or safe pruning method.
Arrange qualified pruning within the verified work limits, protecting traffic and nearby utilities as required. Remove only the growth needed to restore the approved visibility or clearance while preserving tree health. Escalate instability or utility conflicts to the appropriate specialist rather than inferring them from a photo.
Photograph the cleared approach, record measured clearance and pruning limits, and schedule follow-up where regrowth is likely.
Applicable requirement: Tree Trimming. An illustrative image does not establish a field measurement or compliance result.
The image can show a missing cover, damaged pole or apparent fixture issue; daytime photographs cannot establish whether a luminaire operates at night. Electrical circuit condition is not visible.
Create a work order for confirmed outage or missing hardware, including fixture ID and evidence. Have an authorized electrical crew test and repair the correct component under approved safety procedures. Replace covers or hardware with compatible parts and check adjacent units if the fault appears shared.
Document the repair, tested operation and nighttime result with photos and service records.
Applicable requirement: Lighting; day checks cover poles, covers and hardware. An illustrative image does not establish a field measurement or compliance result.
All images and findings are illustrative. They show report structure and inspection topics, not actual field evidence or a compliance decision.
Detailed observations, location fields, practical recommendations and a standards assessment for every finding. Download your assessments as PDF reports with photos or Excel workbooks with picture links. Explore the three-row Excel examples below.
| Location / sample GPS | Potential finding | Recommended next step |
|---|---|---|
| Site C example · Foreground lawn30.332200 -81.655700 | ![]() Pale, browned turf across the foregroundThe foreground turf is yellow-brown while the lawn farther left is greener. | Check species, moisture and irrigation and distinguish dormancy from damage.Picture |
| Site C example · Right planting border30.332300 -81.655600 | ![]() Plant growth obscures sections of the bed edgeFoliage covers sections of the stone bed edge; confirm whether the spread exceeds the intended planting line. | Compare with the planting plan and selectively shape only confirmed excess growth.Picture |
| Site C example · Roadside tree30.332400 -81.655500 | ![]() Large tree limb extends across the roadside vergeA large horizontal limb and hanging foliage sit close to the roadside access area. | Measure clearance and have an arborist define appropriate pruning work.Picture |

Site C example · Foreground lawn · Illustrative location; see the picture for the observation area
Sample GPS: 30.332200, -81.655700
UF/IFAS notes that turf can brown during drought and later recover. Color alone does not establish dead grass or a contract failure. Compare verified turf condition with the project’s maintenance requirements.

Site C example · Right planting border · Illustrative location; see the picture for the observation area
Sample GPS: 30.332300, -81.655600
UF/IFAS describes selective shrub pruning to maintain desired form. The project’s planting plan determines whether this spread needs correction; the image does not establish noncompliance.

Site C example · Roadside tree · Illustrative location; see the picture for the observation area
Sample GPS: 30.332400, -81.655500
UF/IFAS tree-care guidance supports selective pruning for clearance and appropriate arborist involvement. It does not establish a universal facility-access height. Obtain the local or project requirement, measure the route and confirm permissions. Document that comparison before deciding whether the condition meets the requirement.
Each finding links to its own illustrative picture, including Ai-generated demonstration scenes. Descriptions identify visible conditions; location labels and GPS are fictional examples. Field verification is required before deciding compliance or corrective work.
Connect the condition, supporting evidence and next action without losing the context.
Review likely plant types and visible condition; document limbs obscuring a sign.
Keep images of damaged posts, torn fabric or gate gaps with the recommended next step.
Record apparent outages or visible missing hardware, then confirm them with suitable field checks.
Plant identification and counts are estimates for review. Lighting photos cannot verify electrical safety, circuit condition or measured illumination.
Review applicable sourcesUse printable checklists, report examples and documentation guides built around this workflow.
Turn photos and recorded video into a reviewable condition record. Keep visible findings, evidence, recommended actions and follow-up together.
Share observations and supporting pictures in a report your team can review.
Keep category, condition, description and action notes organized. Include location and GPS when supported by the evidence.
Classify mixed photos, review separate asset reports and track work status in the Data Hub.